启闭机包括电机、启闭机、机架、防护罩等组成;采用三级减速方式,用国旋付传动,输出转距更大。启闭机配套钢架克服土建不平整,以减少整机噪声及振动。
The hoist consists of a motor, hoist, frame, protective cover, etc; Adopting a three-stage deceleration method and using a national rotary drive, the output torque is larger. The supporting steel frame of the hoist overcomes the unevenness of the civil engineering to reduce the overall noise and vibration of the machine.
启闭机安全操作规程如下:
The safety operating procedures for the hoist are as follows:
1.工程施工单位,要将启闭机应安装在平整坚实、视野良好的地基之上,机身和地锚必须牢固。要求启闭机与导向滑轮中心线应垂直对正,启闭机距离滑轮一般应不小于十五米。
1. The construction unit should install the hoist on a flat and solid foundation with good visibility, and the body and anchor must be firm. The centerline of the hoist and guide pulley should be perpendicular and aligned, and the distance between the hoist and the pulley should generally not be less than fifteen meters.
2.在调装作业前,应检查钢丝绳、离合器、制动器、保险棘轮,传动滑轮等,确定安全可靠,方可操作。钢丝绳在卷筒上必须排列整齐,作业中最少需保留三圈。在作业时,不准有人跨越启闭机的钢丝绳经防止出现意外。
Before the assembly operation, the steel wire rope, clutch, brake, safety ratchet, transmission pulley, etc. should be checked to ensure safety and reliability before operation. The steel wire rope must be arranged neatly on the drum, and at least three turns must be retained during the operation. During homework, no one is allowed to cross the wire rope of the hoist to prevent accidents.
3.在吊运重物需在空中停留时,除使用制动器外,并应用棘轮保险卡牢。操作时,严禁擅自离开岗位。
When lifting heavy objects that need to stay in the air, in addition to using brakes, a ratchet safety should be used to secure them. During operation, it is strictly prohibited to leave the post without authorization.